We offer free shipping on all orders

{"id":9529239797997,"title":"Miyili Towel Ring Bathroom Hand Towel Holder Square Style Towel Rack Wall Mounted Polished Stainless Steel, D06C Polished Steel","handle":"miyili-towel-ring-bathroom-hand-towel-holder-square-style-towel-rack-wall-mounted-polished-stainless-steel-d06c-polished-steel","description":"\u003ch3\u003eMiyili Towel Ring Bathroom Hand Towel Holder Square Style Towel Rack Wall Mounted Polished Stainless Steel, D06C\u003c\/h3\u003e\n\u003cp id=\"b\"\u003eTowel Ring Bathroom Hand Towel Holder Square Style Towel Rack Wall Mounted\nPolished Stainless Steel\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003eMetal\u003c\/li\u003e\n \u003cli\u003eHIGH QUALITY - Made of premium SUS304 stainless steel, all metal construction, ensuring quality and longevity, performs better in anti-corrosion, anti-rust and anti-tarnish.\u003c\/li\u003e\n \u003cli\u003ePOLISHED STEEL - Our towel rings is polished steel finish, the surface is smooth and delicate, easy to clean, and it offers enhanced visual appeal, suitable for different decoration styles (MODERN, SIMPLE, NORDIC).\u003c\/li\u003e\n \u003cli\u003eCLASSICAL APPEARANCE - Classic square style, smooth touching without scratches your hands, open side design for easy hanging. Add more modern elements for your room decor.\u003c\/li\u003e\n \u003cli\u003eCLEANING \u0026amp; SECURITY - The sturdy towel ring leaves enough space for damp towels to dry quickly that never worrying slide to the floor. Matches our bathroom modern fixtures beautifully and provides a safe and neat household environment to you.\u003c\/li\u003e\n \u003cli\u003eEASY INSTALLATION - NO assembly required, can be EASILY mounted on a variety of surfaces including, but not limited to tile and drywall. Harware pack included. Any question, please feel free to contact our customer service.\u003c\/li\u003e\n \u003c\/ul\u003e","published_at":"2026-08-15T01:20:00+10:00","created_at":"2026-08-15T01:20:00+10:00","vendor":"Miyili","type":"Towel Rings","tags":["home_industrial_July2026"],"price":13300,"price_min":13300,"price_max":13300,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":50487235608813,"title":"Polished Steel","option1":"Polished Steel","option2":null,"option3":null,"sku":"B092M7KL25","requires_shipping":true,"taxable":true,"featured_image":null,"available":true,"name":"Miyili Towel Ring Bathroom Hand Towel Holder Square Style Towel Rack Wall Mounted Polished Stainless Steel, D06C Polished Steel - Polished Steel","public_title":"Polished Steel","options":["Polished Steel"],"price":13300,"weight":259,"compare_at_price":null,"inventory_management":"shopify","barcode":"760570037928","requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/leoforward.com\/cdn\/shop\/files\/B092M7KL25.jpg?v=1786721024","\/\/leoforward.com\/cdn\/shop\/files\/41tuc4WbS7S.jpg?v=1786721026","\/\/leoforward.com\/cdn\/shop\/files\/817FG3-RACS.jpg?v=1786721024","\/\/leoforward.com\/cdn\/shop\/files\/81NihIQz0pS.jpg?v=1786721024","\/\/leoforward.com\/cdn\/shop\/files\/81iUPTqSHjS.jpg?v=1786721026","\/\/leoforward.com\/cdn\/shop\/files\/51XZsm1PgfS.jpg?v=1786721024","\/\/leoforward.com\/cdn\/shop\/files\/41pfglrGGyS.jpg?v=1786721026","\/\/leoforward.com\/cdn\/shop\/files\/41ZKKmL1J8S.jpg?v=1786721026"],"featured_image":"\/\/leoforward.com\/cdn\/shop\/files\/B092M7KL25.jpg?v=1786721024","options":["Color"],"media":[{"alt":null,"id":41541548933357,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1300,"width":1300,"src":"\/\/leoforward.com\/cdn\/shop\/files\/B092M7KL25.jpg?v=1786721024"},"aspect_ratio":1.0,"height":1300,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/B092M7KL25.jpg?v=1786721024","width":1300},{"alt":null,"id":41541548966125,"position":2,"preview_image":{"aspect_ratio":1.0,"height":1300,"width":1300,"src":"\/\/leoforward.com\/cdn\/shop\/files\/41tuc4WbS7S.jpg?v=1786721026"},"aspect_ratio":1.0,"height":1300,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/41tuc4WbS7S.jpg?v=1786721026","width":1300},{"alt":null,"id":41541548998893,"position":3,"preview_image":{"aspect_ratio":1.0,"height":1300,"width":1300,"src":"\/\/leoforward.com\/cdn\/shop\/files\/817FG3-RACS.jpg?v=1786721024"},"aspect_ratio":1.0,"height":1300,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/817FG3-RACS.jpg?v=1786721024","width":1300},{"alt":null,"id":41541549031661,"position":4,"preview_image":{"aspect_ratio":1.0,"height":1300,"width":1300,"src":"\/\/leoforward.com\/cdn\/shop\/files\/81NihIQz0pS.jpg?v=1786721024"},"aspect_ratio":1.0,"height":1300,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/81NihIQz0pS.jpg?v=1786721024","width":1300},{"alt":null,"id":41541549064429,"position":5,"preview_image":{"aspect_ratio":1.0,"height":1300,"width":1300,"src":"\/\/leoforward.com\/cdn\/shop\/files\/81iUPTqSHjS.jpg?v=1786721026"},"aspect_ratio":1.0,"height":1300,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/81iUPTqSHjS.jpg?v=1786721026","width":1300},{"alt":null,"id":41541549097197,"position":6,"preview_image":{"aspect_ratio":1.0,"height":1300,"width":1300,"src":"\/\/leoforward.com\/cdn\/shop\/files\/51XZsm1PgfS.jpg?v=1786721024"},"aspect_ratio":1.0,"height":1300,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/51XZsm1PgfS.jpg?v=1786721024","width":1300},{"alt":null,"id":41541549129965,"position":7,"preview_image":{"aspect_ratio":1.0,"height":1300,"width":1300,"src":"\/\/leoforward.com\/cdn\/shop\/files\/41pfglrGGyS.jpg?v=1786721026"},"aspect_ratio":1.0,"height":1300,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/41pfglrGGyS.jpg?v=1786721026","width":1300},{"alt":null,"id":41541549162733,"position":8,"preview_image":{"aspect_ratio":1.0,"height":1300,"width":1300,"src":"\/\/leoforward.com\/cdn\/shop\/files\/41ZKKmL1J8S.jpg?v=1786721026"},"aspect_ratio":1.0,"height":1300,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/41ZKKmL1J8S.jpg?v=1786721026","width":1300}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"\u003ch3\u003eMiyili Towel Ring Bathroom Hand Towel Holder Square Style Towel Rack Wall Mounted Polished Stainless Steel, D06C\u003c\/h3\u003e\n\u003cp id=\"b\"\u003eTowel Ring Bathroom Hand Towel Holder Square Style Towel Rack Wall Mounted\nPolished Stainless Steel\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003eMetal\u003c\/li\u003e\n \u003cli\u003eHIGH QUALITY - Made of premium SUS304 stainless steel, all metal construction, ensuring quality and longevity, performs better in anti-corrosion, anti-rust and anti-tarnish.\u003c\/li\u003e\n \u003cli\u003ePOLISHED STEEL - Our towel rings is polished steel finish, the surface is smooth and delicate, easy to clean, and it offers enhanced visual appeal, suitable for different decoration styles (MODERN, SIMPLE, NORDIC).\u003c\/li\u003e\n \u003cli\u003eCLASSICAL APPEARANCE - Classic square style, smooth touching without scratches your hands, open side design for easy hanging. Add more modern elements for your room decor.\u003c\/li\u003e\n \u003cli\u003eCLEANING \u0026amp; SECURITY - The sturdy towel ring leaves enough space for damp towels to dry quickly that never worrying slide to the floor. Matches our bathroom modern fixtures beautifully and provides a safe and neat household environment to you.\u003c\/li\u003e\n \u003cli\u003eEASY INSTALLATION - NO assembly required, can be EASILY mounted on a variety of surfaces including, but not limited to tile and drywall. Harware pack included. Any question, please feel free to contact our customer service.\u003c\/li\u003e\n \u003c\/ul\u003e"}

Miyili Towel Ring Bathroom Hand Towel Holder Square Style Towel Rack Wall Mounted Polished Stainless Steel, D06C Polished Steel

In Stock. Leaves warehouse within 2 - 3 business days

$133.00 AUD
Maximum quantity available reached.
Free Shipping Australia Wide
100% Safe & Secure Checkout
100 Days Return Policy *
1 Year Warranty *

Miyili Towel Ring Bathroom Hand Towel Holder Square Style Towel Rack Wall Mounted Polished Stainless Steel, D06C

Towel Ring Bathroom Hand Towel Holder Square Style Towel Rack Wall Mounted Polished Stainless Steel

Product Features

  • Metal
  • HIGH QUALITY - Made of premium SUS304 stainless steel, all metal construction, ensuring quality and longevity, performs better in anti-corrosion, anti-rust and anti-tarnish.
  • POLISHED STEEL - Our towel rings is polished steel finish, the surface is smooth and delicate, easy to clean, and it offers enhanced visual appeal, suitable for different decoration styles (MODERN, SIMPLE, NORDIC).
  • CLASSICAL APPEARANCE - Classic square style, smooth touching without scratches your hands, open side design for easy hanging. Add more modern elements for your room decor.
  • CLEANING & SECURITY - The sturdy towel ring leaves enough space for damp towels to dry quickly that never worrying slide to the floor. Matches our bathroom modern fixtures beautifully and provides a safe and neat household environment to you.
  • EASY INSTALLATION - NO assembly required, can be EASILY mounted on a variety of surfaces including, but not limited to tile and drywall. Harware pack included. Any question, please feel free to contact our customer service.