{"id":8906976198893,"title":"Mishimoto Silicone Coupler, 2.5\" w\/ 1\/8\" NPT Bung Black","handle":"mishimoto-silicone-coupler-2-5-w-1-8-npt-bung-black","description":"\u003ch3\u003eMishimoto Silicone Coupler, 2.5\" w\/ 1\/8\" NPT Bung Black\u003c\/h3\u003e\n\u003cp id=\"b\"\u003eMishimoto 2.5\" silicone coupler featuring a 1\/8th NPT bung.Constructed from\n100% silicone and available in black, blue, and red.\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003eLength: 4.75\" Thickness: 4mm ID: 2.5\" OD: 2.9\" Max Temp: 330F\u003c\/li\u003e\n \u003cli\u003e6061 aluminum 1\/8\" NPT bung for sensors or water\/meth injection\u003c\/li\u003e\n \u003cli\u003eSensor bung is molded into silicone for durable, leak free performance\u003c\/li\u003e\n \u003cli\u003e4-ply silicone and heat resistant embedded fibers\u003c\/li\u003e\n \u003cli\u003eMishimoto Lifetime Warranty\u003c\/li\u003e\n \u003c\/ul\u003e","published_at":"2025-01-03T10:38:44+11:00","created_at":"2025-01-01T00:34:18+11:00","vendor":"Mishimoto","type":"Radiator","tags":["Auto_Dec2024_BestSellers"],"price":18900,"price_min":18900,"price_max":18900,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":47570991284461,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"B00860E27I","requires_shipping":true,"taxable":true,"featured_image":null,"available":true,"name":"Mishimoto Silicone Coupler, 2.5\" w\/ 1\/8\" NPT Bung Black","public_title":null,"options":["Default Title"],"price":18900,"weight":240,"compare_at_price":null,"inventory_management":"shopify","barcode":null,"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/leoforward.com\/cdn\/shop\/files\/B00860E27I.jpg?v=1775748329","\/\/leoforward.com\/cdn\/shop\/files\/41IiT65cnFL.jpg?v=1735652060","\/\/leoforward.com\/cdn\/shop\/files\/51nI7_4L4RL.jpg?v=1735652060","\/\/leoforward.com\/cdn\/shop\/files\/51OiNstCPyL.jpg?v=1735652060","\/\/leoforward.com\/cdn\/shop\/files\/51C7nijQEfL.jpg?v=1735652061","\/\/leoforward.com\/cdn\/shop\/files\/41pridn9F1L.jpg?v=1735652060","\/\/leoforward.com\/cdn\/shop\/files\/61wbs1HijsL.jpg?v=1735652061"],"featured_image":"\/\/leoforward.com\/cdn\/shop\/files\/B00860E27I.jpg?v=1775748329","options":["Title"],"media":[{"alt":null,"id":34853396545773,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1000,"width":1000,"src":"\/\/leoforward.com\/cdn\/shop\/files\/B00860E27I.jpg?v=1775748329"},"aspect_ratio":1.0,"height":1000,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/B00860E27I.jpg?v=1775748329","width":1000},{"alt":null,"id":34853396578541,"position":2,"preview_image":{"aspect_ratio":1.0,"height":1000,"width":1000,"src":"\/\/leoforward.com\/cdn\/shop\/files\/41IiT65cnFL.jpg?v=1735652060"},"aspect_ratio":1.0,"height":1000,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/41IiT65cnFL.jpg?v=1735652060","width":1000},{"alt":null,"id":34853396611309,"position":3,"preview_image":{"aspect_ratio":1.0,"height":1000,"width":1000,"src":"\/\/leoforward.com\/cdn\/shop\/files\/51nI7_4L4RL.jpg?v=1735652060"},"aspect_ratio":1.0,"height":1000,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/51nI7_4L4RL.jpg?v=1735652060","width":1000},{"alt":null,"id":34853396644077,"position":4,"preview_image":{"aspect_ratio":1.0,"height":1000,"width":1000,"src":"\/\/leoforward.com\/cdn\/shop\/files\/51OiNstCPyL.jpg?v=1735652060"},"aspect_ratio":1.0,"height":1000,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/51OiNstCPyL.jpg?v=1735652060","width":1000},{"alt":null,"id":34853396676845,"position":5,"preview_image":{"aspect_ratio":1.0,"height":1000,"width":1000,"src":"\/\/leoforward.com\/cdn\/shop\/files\/51C7nijQEfL.jpg?v=1735652061"},"aspect_ratio":1.0,"height":1000,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/51C7nijQEfL.jpg?v=1735652061","width":1000},{"alt":null,"id":34853396709613,"position":6,"preview_image":{"aspect_ratio":1.0,"height":1000,"width":1000,"src":"\/\/leoforward.com\/cdn\/shop\/files\/41pridn9F1L.jpg?v=1735652060"},"aspect_ratio":1.0,"height":1000,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/41pridn9F1L.jpg?v=1735652060","width":1000},{"alt":null,"id":34853396742381,"position":7,"preview_image":{"aspect_ratio":1.0,"height":1080,"width":1080,"src":"\/\/leoforward.com\/cdn\/shop\/files\/61wbs1HijsL.jpg?v=1735652061"},"aspect_ratio":1.0,"height":1080,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/61wbs1HijsL.jpg?v=1735652061","width":1080}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"\u003ch3\u003eMishimoto Silicone Coupler, 2.5\" w\/ 1\/8\" NPT Bung Black\u003c\/h3\u003e\n\u003cp id=\"b\"\u003eMishimoto 2.5\" silicone coupler featuring a 1\/8th NPT bung.Constructed from\n100% silicone and available in black, blue, and red.\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003eLength: 4.75\" Thickness: 4mm ID: 2.5\" OD: 2.9\" Max Temp: 330F\u003c\/li\u003e\n \u003cli\u003e6061 aluminum 1\/8\" NPT bung for sensors or water\/meth injection\u003c\/li\u003e\n \u003cli\u003eSensor bung is molded into silicone for durable, leak free performance\u003c\/li\u003e\n \u003cli\u003e4-ply silicone and heat resistant embedded fibers\u003c\/li\u003e\n \u003cli\u003eMishimoto Lifetime Warranty\u003c\/li\u003e\n \u003c\/ul\u003e"}
Mishimoto Silicone Coupler, 2.5" w/ 1/8" NPT Bung Black
Mishimoto Silicone Coupler, 2.5" w/ 1/8" NPT Bung Black
Mishimoto 2.5" silicone coupler featuring a 1/8th NPT bung.Constructed from 100% silicone and available in black, blue, and red.
Product Features
- Length: 4.75" Thickness: 4mm ID: 2.5" OD: 2.9" Max Temp: 330F
- 6061 aluminum 1/8" NPT bung for sensors or water/meth injection
- Sensor bung is molded into silicone for durable, leak free performance
- 4-ply silicone and heat resistant embedded fibers
- Mishimoto Lifetime Warranty