We offer free shipping on all orders

{"id":9153145536749,"title":"DS 120MM PWM Fans, 3Pack LED RGB Case Fans for PC Cases, CPU Coolers, Water Cooling Radiators System (Compatible with ASUS Aura Sync or MSI Mystic Control, B Series)","handle":"ds-120mm-pwm-fans-3pack-led-rgb-case-fans-for-pc-cases-cpu-coolers-water-cooling-radiators-system-compatible-with-asus-aura-sync-or-msi-mystic-control-b-series","description":"\u003ch3\u003eDS 120MM PWM Fans, 3Pack LED RGB Case Fans for PC Cases, CPU Coolers, Water Cooling Radiators System (Compatible with ASUS Aura Sync or MSI Mystic Control, B Series)\u003c\/h3\u003e\r\n\u003cp id=\"b\"\u003e\u003c\/p\u003e \r\n\r\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\r\n \u003cul class=\"a\"\u003e\r\n \u003cli\u003eGreat Air Flow: PWM Fan control allows for dynamic speed adjustment between 700 - 1800 rpm, minimizing noise or maximizing airflow\u003c\/li\u003e\r\n \u003cli\u003eCustomizable RGB colors: RGB function with motherboard sync-control for 5V 3PIN motherboard including Asus(B350-I) and MSI (X470-M7)\u003c\/li\u003e\r\n \u003cli\u003eShockproof Design: 8 Silicone shock pads ensure that the fan will not vibrate when it is running\u003c\/li\u003e\r\n \u003cli\u003eWide Compatibility: CPU Air Cooler\/120\/240\/360mm Radiators\/Water Cooling\/ most models of PC case\u003c\/li\u003e\r\n \u003cli\u003eThe DS PC Motherboard Sync case Fans Kit Unique Halo Arc-shaped Frame Shows Horgeous and Vivid Visual Effect\u003c\/li\u003e\r\n \u003c\/ul\u003e","published_at":"2025-10-22T22:42:16+11:00","created_at":"2025-10-22T22:42:12+11:00","vendor":"DS leddess","type":"Internal Components","tags":["electronics_selected_Oct2025"],"price":15700,"price_min":15700,"price_max":15700,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":48909100548333,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"B07D32RPRR","requires_shipping":true,"taxable":true,"featured_image":null,"available":true,"name":"DS 120MM PWM Fans, 3Pack LED RGB Case Fans for PC Cases, CPU Coolers, Water Cooling Radiators System (Compatible with ASUS Aura Sync or MSI Mystic Control, B Series)","public_title":null,"options":["Default Title"],"price":15700,"weight":531,"compare_at_price":null,"inventory_management":"shopify","barcode":"608754737281","requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/leoforward.com\/cdn\/shop\/files\/B07D32RPRR.jpg?v=1775796976","\/\/leoforward.com\/cdn\/shop\/files\/715ov3QaTHL.jpg?v=1761133334","\/\/leoforward.com\/cdn\/shop\/files\/710Evm_1gEL.jpg?v=1761133335","\/\/leoforward.com\/cdn\/shop\/files\/618EgyptXzL.jpg?v=1761133335","\/\/leoforward.com\/cdn\/shop\/files\/71_hYojvliL.jpg?v=1761133335","\/\/leoforward.com\/cdn\/shop\/files\/61RLOUpU20L.jpg?v=1761133334","\/\/leoforward.com\/cdn\/shop\/files\/61tORFsxTiL.jpg?v=1761133335","\/\/leoforward.com\/cdn\/shop\/files\/61_dRybg91L.jpg?v=1761133334"],"featured_image":"\/\/leoforward.com\/cdn\/shop\/files\/B07D32RPRR.jpg?v=1775796976","options":["Title"],"media":[{"alt":null,"id":36954928218349,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/leoforward.com\/cdn\/shop\/files\/B07D32RPRR.jpg?v=1775796976"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/B07D32RPRR.jpg?v=1775796976","width":1600},{"alt":null,"id":36954928251117,"position":2,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/leoforward.com\/cdn\/shop\/files\/715ov3QaTHL.jpg?v=1761133334"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/715ov3QaTHL.jpg?v=1761133334","width":1600},{"alt":null,"id":36954928283885,"position":3,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/leoforward.com\/cdn\/shop\/files\/710Evm_1gEL.jpg?v=1761133335"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/710Evm_1gEL.jpg?v=1761133335","width":1500},{"alt":null,"id":36954928316653,"position":4,"preview_image":{"aspect_ratio":1.0,"height":1000,"width":1000,"src":"\/\/leoforward.com\/cdn\/shop\/files\/618EgyptXzL.jpg?v=1761133335"},"aspect_ratio":1.0,"height":1000,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/618EgyptXzL.jpg?v=1761133335","width":1000},{"alt":null,"id":36954928349421,"position":5,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/leoforward.com\/cdn\/shop\/files\/71_hYojvliL.jpg?v=1761133335"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/71_hYojvliL.jpg?v=1761133335","width":1600},{"alt":null,"id":36954928382189,"position":6,"preview_image":{"aspect_ratio":1.0,"height":1000,"width":1000,"src":"\/\/leoforward.com\/cdn\/shop\/files\/61RLOUpU20L.jpg?v=1761133334"},"aspect_ratio":1.0,"height":1000,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/61RLOUpU20L.jpg?v=1761133334","width":1000},{"alt":null,"id":36954928414957,"position":7,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/leoforward.com\/cdn\/shop\/files\/61tORFsxTiL.jpg?v=1761133335"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/61tORFsxTiL.jpg?v=1761133335","width":1600},{"alt":null,"id":36954928447725,"position":8,"preview_image":{"aspect_ratio":1.283,"height":1169,"width":1500,"src":"\/\/leoforward.com\/cdn\/shop\/files\/61_dRybg91L.jpg?v=1761133334"},"aspect_ratio":1.283,"height":1169,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/61_dRybg91L.jpg?v=1761133334","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"\u003ch3\u003eDS 120MM PWM Fans, 3Pack LED RGB Case Fans for PC Cases, CPU Coolers, Water Cooling Radiators System (Compatible with ASUS Aura Sync or MSI Mystic Control, B Series)\u003c\/h3\u003e\r\n\u003cp id=\"b\"\u003e\u003c\/p\u003e \r\n\r\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\r\n \u003cul class=\"a\"\u003e\r\n \u003cli\u003eGreat Air Flow: PWM Fan control allows for dynamic speed adjustment between 700 - 1800 rpm, minimizing noise or maximizing airflow\u003c\/li\u003e\r\n \u003cli\u003eCustomizable RGB colors: RGB function with motherboard sync-control for 5V 3PIN motherboard including Asus(B350-I) and MSI (X470-M7)\u003c\/li\u003e\r\n \u003cli\u003eShockproof Design: 8 Silicone shock pads ensure that the fan will not vibrate when it is running\u003c\/li\u003e\r\n \u003cli\u003eWide Compatibility: CPU Air Cooler\/120\/240\/360mm Radiators\/Water Cooling\/ most models of PC case\u003c\/li\u003e\r\n \u003cli\u003eThe DS PC Motherboard Sync case Fans Kit Unique Halo Arc-shaped Frame Shows Horgeous and Vivid Visual Effect\u003c\/li\u003e\r\n \u003c\/ul\u003e"}

DS 120MM PWM Fans, 3Pack LED RGB Case Fans for PC Cases, CPU Coolers, Water Cooling Radiators System (Compatible with ASUS Aura Sync or MSI Mystic Control, B Series)

In Stock. Leaves warehouse within 2 - 3 business days

$157.00 AUD
Maximum quantity available reached.
Free Shipping Australia Wide
100% Safe & Secure Checkout
100 Days Return Policy *
1 Year Warranty *

DS 120MM PWM Fans, 3Pack LED RGB Case Fans for PC Cases, CPU Coolers, Water Cooling Radiators System (Compatible with ASUS Aura Sync or MSI Mystic Control, B Series)

Product Features

  • Great Air Flow: PWM Fan control allows for dynamic speed adjustment between 700 - 1800 rpm, minimizing noise or maximizing airflow
  • Customizable RGB colors: RGB function with motherboard sync-control for 5V 3PIN motherboard including Asus(B350-I) and MSI (X470-M7)
  • Shockproof Design: 8 Silicone shock pads ensure that the fan will not vibrate when it is running
  • Wide Compatibility: CPU Air Cooler/120/240/360mm Radiators/Water Cooling/ most models of PC case
  • The DS PC Motherboard Sync case Fans Kit Unique Halo Arc-shaped Frame Shows Horgeous and Vivid Visual Effect