Aqua Pro 69719 4.5" Long Lead Free Magnesium Anode Rod with 1/2" Male Pipe Thread
Aqua Pro 69719 4.5" Long Lead Free Magnesium Anode Rod with 1/2" Male Pipe Thread
Water Heater Anode Rod; For Atwood Water Heaters; 4-1/2 Inch Length; Magnesium; With 1/2 Inch Male Pipe Thread Drain Plug; Without Retail Packaging; Lead Free
Product Features
- For Atwood water heaters
- Lead free
- 4.5 inches long
- 1/2 inch male pipe thread
- Bulk