We offer free shipping on all orders

{"id":9533731176685,"title":"900W High Power DC Boost Converter 8-32V to 55V Adjustable Step-Up Voltage Regulator Module for Audio Amplifier DIY Speaker System","handle":"900w-high-power-dc-boost-converter-8-32v-to-55v-adjustable-step-up-voltage-regulator-module-for-audio-amplifier-diy-speaker-system","description":"\u003ch3\u003e900W High Power DC Boost Converter 8-32V to 55V Adjustable Step-Up Voltage Regulator Module for Audio Amplifier DIY Speaker System\u003c\/h3\u003e\n\u003cp id=\"b\"\u003e\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003eHigh Efficiency Performance----Featuring advanced synchronous rectification technology, this boost converter delivers up to 96% efficiency, reducing heat and energy loss while supporting high-power audio amplifier performance.\u003c\/li\u003e\n \u003cli\u003eUltra-Low Ripple Noise----Engineered with low ripple output (150250mV), significantly lower than typical modules, it minimizes background noise and delivers cleaner, clearer audio performance.\u003c\/li\u003e\n \u003cli\u003eActive Cooling System----Built-in cooling fan directly targets MOSFETs and inductors, ensuring efficient heat dissipation and stable operation even under full load conditions.\u003c\/li\u003e\n \u003cli\u003eStable Output \u0026amp; Fast Response----Provides stable voltage output with fast transient response, eliminating voltage drop issues and enhancing both bass impact and high-frequency detail.\u003c\/li\u003e\n \u003cli\u003eMultiple Protection Features----Equipped with reverse polarity, overcurrent, and undervoltage protection. Supports DC 832V input, adjustable output up to 55V, 30A current, and up to 900W power for safe and reliable operation.\u003c\/li\u003e\n \u003c\/ul\u003e","published_at":"2026-08-17T20:56:53+10:00","created_at":"2026-08-17T19:40:32+10:00","vendor":"DAJUNGUO","type":"Amplifiers","tags":["electronics_NR_Aug2026"],"price":18100,"price_min":18100,"price_max":18100,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":50498499510509,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"B0GYRXNBC8","requires_shipping":true,"taxable":true,"featured_image":null,"available":true,"name":"900W High Power DC Boost Converter 8-32V to 55V Adjustable Step-Up Voltage Regulator Module for Audio Amplifier DIY Speaker System","public_title":null,"options":["Default Title"],"price":18100,"weight":308,"compare_at_price":null,"inventory_management":"shopify","barcode":"607606795073","requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/leoforward.com\/cdn\/shop\/files\/B0GYRXNBC8.jpg?v=1786959634","\/\/leoforward.com\/cdn\/shop\/files\/71qAVZtAWIL.jpg?v=1786959634","\/\/leoforward.com\/cdn\/shop\/files\/91FskBIpJUL.jpg?v=1786959634","\/\/leoforward.com\/cdn\/shop\/files\/817PUSaQU5L.jpg?v=1786959634","\/\/leoforward.com\/cdn\/shop\/files\/81wBs6bK8JL.jpg?v=1786959634","\/\/leoforward.com\/cdn\/shop\/files\/71wKSSDSnRL.jpg?v=1786959634"],"featured_image":"\/\/leoforward.com\/cdn\/shop\/files\/B0GYRXNBC8.jpg?v=1786959634","options":["Title"],"media":[{"alt":null,"id":41585995284717,"position":1,"preview_image":{"aspect_ratio":1.0,"height":2000,"width":2000,"src":"\/\/leoforward.com\/cdn\/shop\/files\/B0GYRXNBC8.jpg?v=1786959634"},"aspect_ratio":1.0,"height":2000,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/B0GYRXNBC8.jpg?v=1786959634","width":2000},{"alt":null,"id":41585995317485,"position":2,"preview_image":{"aspect_ratio":1.0,"height":2000,"width":2000,"src":"\/\/leoforward.com\/cdn\/shop\/files\/71qAVZtAWIL.jpg?v=1786959634"},"aspect_ratio":1.0,"height":2000,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/71qAVZtAWIL.jpg?v=1786959634","width":2000},{"alt":null,"id":41585995350253,"position":3,"preview_image":{"aspect_ratio":1.0,"height":2000,"width":2000,"src":"\/\/leoforward.com\/cdn\/shop\/files\/91FskBIpJUL.jpg?v=1786959634"},"aspect_ratio":1.0,"height":2000,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/91FskBIpJUL.jpg?v=1786959634","width":2000},{"alt":null,"id":41585995383021,"position":4,"preview_image":{"aspect_ratio":1.0,"height":2000,"width":2000,"src":"\/\/leoforward.com\/cdn\/shop\/files\/817PUSaQU5L.jpg?v=1786959634"},"aspect_ratio":1.0,"height":2000,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/817PUSaQU5L.jpg?v=1786959634","width":2000},{"alt":null,"id":41585995415789,"position":5,"preview_image":{"aspect_ratio":1.0,"height":2000,"width":2000,"src":"\/\/leoforward.com\/cdn\/shop\/files\/81wBs6bK8JL.jpg?v=1786959634"},"aspect_ratio":1.0,"height":2000,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/81wBs6bK8JL.jpg?v=1786959634","width":2000},{"alt":null,"id":41585995448557,"position":6,"preview_image":{"aspect_ratio":1.0,"height":2000,"width":2000,"src":"\/\/leoforward.com\/cdn\/shop\/files\/71wKSSDSnRL.jpg?v=1786959634"},"aspect_ratio":1.0,"height":2000,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/71wKSSDSnRL.jpg?v=1786959634","width":2000}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"\u003ch3\u003e900W High Power DC Boost Converter 8-32V to 55V Adjustable Step-Up Voltage Regulator Module for Audio Amplifier DIY Speaker System\u003c\/h3\u003e\n\u003cp id=\"b\"\u003e\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003eHigh Efficiency Performance----Featuring advanced synchronous rectification technology, this boost converter delivers up to 96% efficiency, reducing heat and energy loss while supporting high-power audio amplifier performance.\u003c\/li\u003e\n \u003cli\u003eUltra-Low Ripple Noise----Engineered with low ripple output (150250mV), significantly lower than typical modules, it minimizes background noise and delivers cleaner, clearer audio performance.\u003c\/li\u003e\n \u003cli\u003eActive Cooling System----Built-in cooling fan directly targets MOSFETs and inductors, ensuring efficient heat dissipation and stable operation even under full load conditions.\u003c\/li\u003e\n \u003cli\u003eStable Output \u0026amp; Fast Response----Provides stable voltage output with fast transient response, eliminating voltage drop issues and enhancing both bass impact and high-frequency detail.\u003c\/li\u003e\n \u003cli\u003eMultiple Protection Features----Equipped with reverse polarity, overcurrent, and undervoltage protection. Supports DC 832V input, adjustable output up to 55V, 30A current, and up to 900W power for safe and reliable operation.\u003c\/li\u003e\n \u003c\/ul\u003e"}

900W High Power DC Boost Converter 8-32V to 55V Adjustable Step-Up Voltage Regulator Module for Audio Amplifier DIY Speaker System

In Stock. Leaves warehouse within 2 - 3 business days

$181.00 AUD
Maximum quantity available reached.
Free Shipping Australia Wide
100% Safe & Secure Checkout
100 Days Return Policy *
1 Year Warranty *

900W High Power DC Boost Converter 8-32V to 55V Adjustable Step-Up Voltage Regulator Module for Audio Amplifier DIY Speaker System

Product Features

  • High Efficiency Performance----Featuring advanced synchronous rectification technology, this boost converter delivers up to 96% efficiency, reducing heat and energy loss while supporting high-power audio amplifier performance.
  • Ultra-Low Ripple Noise----Engineered with low ripple output (150250mV), significantly lower than typical modules, it minimizes background noise and delivers cleaner, clearer audio performance.
  • Active Cooling System----Built-in cooling fan directly targets MOSFETs and inductors, ensuring efficient heat dissipation and stable operation even under full load conditions.
  • Stable Output & Fast Response----Provides stable voltage output with fast transient response, eliminating voltage drop issues and enhancing both bass impact and high-frequency detail.
  • Multiple Protection Features----Equipped with reverse polarity, overcurrent, and undervoltage protection. Supports DC 832V input, adjustable output up to 55V, 30A current, and up to 900W power for safe and reliable operation.