{"id":8908323750125,"title":"4-in-1 DEF Antifreeze Coolant Refractometer for Automobile Antifreeze System, Diesel Exhaust Fluid, Battery Acid and Windshield Washer Fluid","handle":"4-in-1-def-antifreeze-coolant-refractometer-for-automobile-antifreeze-system-diesel-exhaust-fluid-battery-acid-and-windshield-washer-fluid","description":"\u003ch3\u003e4-in-1 DEF Antifreeze Coolant Refractometer for Automobile Antifreeze System, Diesel Exhaust Fluid, Battery Acid and Windshield Washer Fluid\u003c\/h3\u003e\n\u003cp id=\"b\"\u003e\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003eFunction 1: Measuring freezing point of automobile antifreeze based on ethylene glycol or propylene glycol.Measuring Range: -50 to 0 C.\u003c\/li\u003e\n \u003cli\u003eFunction 2: Measuring specific gravity of battery acid and provide a quick reference of battery charge condition.Measuring Range:1.10 to 1.40 kg\/l\u003c\/li\u003e\n \u003cli\u003eFunction 3: Measuring windshield washer fluid based on ethanol or isopropyl alcohol.Measuring Range:-40 to 0 C\u003c\/li\u003e\n \u003cli\u003eFunction 4:Measuring Urea Concentration in automobile diesel exhaust fluid (DEF).Measuring Range:30% to 35%\u003c\/li\u003e\n \u003cli\u003eFeatures automatic temperature compensation: makes it even easier to get fast results.\u003c\/li\u003e\n \u003c\/ul\u003e","published_at":"2025-01-07T10:49:11+11:00","created_at":"2025-01-03T10:18:42+11:00","vendor":"aichose","type":"Antifreezes \u0026 Coolants","tags":["Auto_Dec2024_BestSellers"],"price":16200,"price_min":16200,"price_max":16200,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":47578049380589,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"B07DLDZFJX","requires_shipping":true,"taxable":true,"featured_image":null,"available":true,"name":"4-in-1 DEF Antifreeze Coolant Refractometer for Automobile Antifreeze System, Diesel Exhaust Fluid, Battery Acid and Windshield Washer Fluid","public_title":null,"options":["Default Title"],"price":16200,"weight":231,"compare_at_price":null,"inventory_management":"shopify","barcode":null,"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/leoforward.com\/cdn\/shop\/files\/B07DLDZFJX.jpg?v=1775750845","\/\/leoforward.com\/cdn\/shop\/files\/71CvTqKDyOL.jpg?v=1735859924","\/\/leoforward.com\/cdn\/shop\/files\/71vq868Q1fL.jpg?v=1735859924","\/\/leoforward.com\/cdn\/shop\/files\/51WBs77hjZL.jpg?v=1735859924","\/\/leoforward.com\/cdn\/shop\/files\/61PfT9IN0JL.jpg?v=1735859924","\/\/leoforward.com\/cdn\/shop\/files\/71gW4CewxQL.jpg?v=1735859924","\/\/leoforward.com\/cdn\/shop\/files\/51DFKBg1eWL.jpg?v=1735859924","\/\/leoforward.com\/cdn\/shop\/files\/51tsFiRn0SL.jpg?v=1735859924","\/\/leoforward.com\/cdn\/shop\/files\/51ppatHlRvL.jpg?v=1735859924"],"featured_image":"\/\/leoforward.com\/cdn\/shop\/files\/B07DLDZFJX.jpg?v=1775750845","options":["Title"],"media":[{"alt":null,"id":34870718136557,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1001,"width":1001,"src":"\/\/leoforward.com\/cdn\/shop\/files\/B07DLDZFJX.jpg?v=1775750845"},"aspect_ratio":1.0,"height":1001,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/B07DLDZFJX.jpg?v=1775750845","width":1001},{"alt":null,"id":34870718169325,"position":2,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/leoforward.com\/cdn\/shop\/files\/71CvTqKDyOL.jpg?v=1735859924"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/71CvTqKDyOL.jpg?v=1735859924","width":1500},{"alt":null,"id":34870718202093,"position":3,"preview_image":{"aspect_ratio":1.0,"height":1000,"width":1000,"src":"\/\/leoforward.com\/cdn\/shop\/files\/71vq868Q1fL.jpg?v=1735859924"},"aspect_ratio":1.0,"height":1000,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/71vq868Q1fL.jpg?v=1735859924","width":1000},{"alt":null,"id":34870718234861,"position":4,"preview_image":{"aspect_ratio":1.0,"height":1001,"width":1001,"src":"\/\/leoforward.com\/cdn\/shop\/files\/51WBs77hjZL.jpg?v=1735859924"},"aspect_ratio":1.0,"height":1001,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/51WBs77hjZL.jpg?v=1735859924","width":1001},{"alt":null,"id":34870718267629,"position":5,"preview_image":{"aspect_ratio":1.0,"height":1000,"width":1000,"src":"\/\/leoforward.com\/cdn\/shop\/files\/61PfT9IN0JL.jpg?v=1735859924"},"aspect_ratio":1.0,"height":1000,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/61PfT9IN0JL.jpg?v=1735859924","width":1000},{"alt":null,"id":34870718300397,"position":6,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/leoforward.com\/cdn\/shop\/files\/71gW4CewxQL.jpg?v=1735859924"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/71gW4CewxQL.jpg?v=1735859924","width":1500},{"alt":null,"id":34870718333165,"position":7,"preview_image":{"aspect_ratio":1.0,"height":1001,"width":1001,"src":"\/\/leoforward.com\/cdn\/shop\/files\/51DFKBg1eWL.jpg?v=1735859924"},"aspect_ratio":1.0,"height":1001,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/51DFKBg1eWL.jpg?v=1735859924","width":1001},{"alt":null,"id":34870718365933,"position":8,"preview_image":{"aspect_ratio":1.0,"height":1001,"width":1001,"src":"\/\/leoforward.com\/cdn\/shop\/files\/51tsFiRn0SL.jpg?v=1735859924"},"aspect_ratio":1.0,"height":1001,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/51tsFiRn0SL.jpg?v=1735859924","width":1001},{"alt":null,"id":34870718398701,"position":9,"preview_image":{"aspect_ratio":1.0,"height":1000,"width":1000,"src":"\/\/leoforward.com\/cdn\/shop\/files\/51ppatHlRvL.jpg?v=1735859924"},"aspect_ratio":1.0,"height":1000,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/files\/51ppatHlRvL.jpg?v=1735859924","width":1000}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"\u003ch3\u003e4-in-1 DEF Antifreeze Coolant Refractometer for Automobile Antifreeze System, Diesel Exhaust Fluid, Battery Acid and Windshield Washer Fluid\u003c\/h3\u003e\n\u003cp id=\"b\"\u003e\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003eFunction 1: Measuring freezing point of automobile antifreeze based on ethylene glycol or propylene glycol.Measuring Range: -50 to 0 C.\u003c\/li\u003e\n \u003cli\u003eFunction 2: Measuring specific gravity of battery acid and provide a quick reference of battery charge condition.Measuring Range:1.10 to 1.40 kg\/l\u003c\/li\u003e\n \u003cli\u003eFunction 3: Measuring windshield washer fluid based on ethanol or isopropyl alcohol.Measuring Range:-40 to 0 C\u003c\/li\u003e\n \u003cli\u003eFunction 4:Measuring Urea Concentration in automobile diesel exhaust fluid (DEF).Measuring Range:30% to 35%\u003c\/li\u003e\n \u003cli\u003eFeatures automatic temperature compensation: makes it even easier to get fast results.\u003c\/li\u003e\n \u003c\/ul\u003e"}
4-in-1 DEF Antifreeze Coolant Refractometer for Automobile Antifreeze System, Diesel Exhaust Fluid, Battery Acid and Windshield Washer Fluid
4-in-1 DEF Antifreeze Coolant Refractometer for Automobile Antifreeze System, Diesel Exhaust Fluid, Battery Acid and Windshield Washer Fluid
Product Features
- Function 1: Measuring freezing point of automobile antifreeze based on ethylene glycol or propylene glycol.Measuring Range: -50 to 0 C.
- Function 2: Measuring specific gravity of battery acid and provide a quick reference of battery charge condition.Measuring Range:1.10 to 1.40 kg/l
- Function 3: Measuring windshield washer fluid based on ethanol or isopropyl alcohol.Measuring Range:-40 to 0 C
- Function 4:Measuring Urea Concentration in automobile diesel exhaust fluid (DEF).Measuring Range:30% to 35%
- Features automatic temperature compensation: makes it even easier to get fast results.