Aqua Pro 69716 9.5'' Long Lead Free Packaged Magnesium Anode Rod with 3/4" Male Pipe Thread 1
Aqua Pro 69716 9.5'' Long Lead Free Packaged Magnesium Anode Rod with 3/4" Male Pipe Thread
Item Package Quantity:1 The single most important factor in tank life is the condition of its anode. Aqua Pro Magnesium Anode Rods will attract the elements that cause corrosion, protecting the tank from those elements. Simply replace your MPT drain plug with the Aqua Pro Anode Rod to protect your tank. Magnesium Anode Rod for Suburban and Morflo Water Heaters.
Product Features
- For suburban and MorFlo water heaters
- Lead free
- 9 inches long
- 3/4 inch male pipe thread
- Packaged
Related Products
Suburban 161109 Gas Valve, Regular
Suburban 161109 Gas Valve, Regular
$255.00 AUD
Suburban 161109 Gas Valve, Regular 161109 Suburban MFG 3/8" NPT Inlet x1/4" Outlet SW Series Water Heater Gas Valve Product Features The Package Length of the Product is 5.6 centimeters The Package Width of the Product is 7.9 centimeters The Package Height of the Product is 11.9 centimeters Package Weight...
Suburban 520900 Water Heater Ele...
Suburban 520900 Water Heater Element with Gasket for SW-Series - 120V
$157.00 AUD
Suburban 520900 Water Heater Element with Gasket for SW-Series - 120V SUBURBAN MFG 520900 Product Features Mounting Type: Screw-In Package Dimensions: 3.7 L x 27.7 H x 6.1 W (centimeters) Package Weight : 0.235 kilograms Country of Origin : China
Suburban Manufacturing Suburban ...
Suburban Manufacturing Suburban 120V T-Stat/Limi 232306 1
$124.00 AUD
Suburban Manufacturing Suburban 120V T-Stat/Limi 232306 Item Package Quantity:1 Standard 130 degrees - Electric (120 VAC) - After Serial 940900091; (ID2306) {NOTE: The spade connection blades are straight (parallel to the back plate). These are 120 VAC connections!} Product Features 232306
Suburban 234795 Standard Water H...
Suburban 234795 Standard Water Heater Wall Switch Assembly - Cream
$130.00 AUD
Suburban 234795 Standard Water Heater Wall Switch Assembly - Cream Suburban Manufacturing pioneered space-saving, horizontally vented gas heating systems, water heaters, solid state spark ignition systems and efficient DC furnace motors since becoming a supplier to the RV industry in the late 1960s. The company's goal was, and remains, to manufa...
Wanheyao Anode Rod - 3/4" NPT...
Wanheyao Anode Rod - 3/4" NPT Thread Magnesium Anode Rod 9" Length for Hot Water Heaters Prevent Corrosion
$119.00 AUD
Wanheyao Anode Rod - 3/4" NPT Thread Magnesium Anode Rod 9" Length for Hot Water Heaters Prevent Corrosion Condition: Brand new Package includes: 1x Magnesium Anode Rod for Hot Water Heaters Color: Silver Dimension: Rod body length: 9" (22.8cm); Thread: 3/4" NPT Material: High quality Magnesium. Features: Provides protection against galvanic cor...
Zetiling Cushion case,Colorful G...
Zetiling Cushion case,Colorful Geometry Style Throw Pillow Covers Cases Square Decorative Cushion Covers Pillowcase Cushion Case for Sofa,Couch for Home Car Decor
$102.00 AUD
Zetiling Cushion case,Colorful Geometry Style Throw Pillow Covers Cases Square Decorative Cushion Covers Pillowcase Cushion Case for Sofa,Couch for Home Car Decor Features: Powered by solar panel, this water pump is safe and reliable with low energy consumption. When the solar panel can receive enough sunshine, the pump will start to work at 3 s...
Camco 02292/02293 3800W 240V Scr...
Camco 02292/02293 3800W 240V Screw-In Water Heater Element - High Watt Density
$145.00 AUD
Camco 02292/02293 3800W 240V Screw-In Water Heater Element - High Watt Density 3800W, 240V, Water Screw-In Heater Element, High Watt Density, Fits Most Models Of American, A.O. Smith, Bradford White, Craft Master, General Electric, GS Wood, Kenmore, Lochinvar, Maytag, Mor-flo, Reliance, Rheem, Richmond, Ruud, Sears, State, & Whirlpool Heater...
Camco 11593 Magnesium Anode Rod ...
Camco 11593 Magnesium Anode Rod for 10 Gallon Atwood Hot Water Heaters
$168.00 AUD
Camco 11593 Magnesium Anode Rod for 10 Gallon Atwood Hot Water Heaters Camco's RV Magnesium Anode Rod fits Atwood 10 gallon hot water heaters. It is 9.5" long and has a diameter of 0.60". It extends the life of a water heater by attracting corrosive elements in the water, protecting your tank and elements from corrosion. Product Features ...
Suburban 160921 Thermostat
Suburban 160921 Thermostat
$136.00 AUD
Suburban 160921 Thermostat SUBURBAN MFG 160921 Product Features 160921
Camco 11683 3/8" Water Heater Dr...
Camco 11683 3/8" Water Heater Drain Valve 3/8 Inch
$107.00 AUD
Camco 11683 3/8" Water Heater Drain Valve Size:3/8 Inch Use the Camco RV 3/8"Water Heater Drain Valve to replace your water heater drain valve. This sturdy brass replacement is easy to install. Product Features Replace faulty RV water heater valve Easy installation Durable brass construction 3/8" NPT male...
Invensys (110-509 Replacement Wa...
Invensys (110-509 Replacement Water Heater Gas Control
$245.00 AUD
Invensys (110-509 Replacement Water Heater Gas Control REPLACEMENT WATER HEATER GAS CONTROLS - For use on recreational vehicles only, not for home use. For LP gas only. 11 Inch water columns. Adjustable from 120 Degree-160 Degree Fahrenheit. 3/8 inch Inverted Flare x 3/8 inch Inverted Flare Fits on Morflo 32303, 690-0140, Phillips Mobil-Temp NP-...
Atwood 93866 OEM RV Water Heater...
Atwood 93866 OEM RV Water Heater Thermal Cutoff Kit - Replacement Part, Toilet Part and Fittings - Pack of 2
$156.00 AUD
Atwood 93866 OEM RV Water Heater Thermal Cutoff Kit - Replacement Part, Toilet Part and Fittings - Pack of 2 Product Features
Camco 02583 4500W 240V Screw-In ...
Camco 02583 4500W 240V Screw-In Foldback Water Heater Element - Low Watt Density, Silver / Pewter
$135.00 AUD
Camco 02583 4500W 240V Screw-In Foldback Water Heater Element - Low Watt Density, Silver / Pewter 02583 Wattage: 4500 Features: -Screw-In Element.-Element comes with one gasket.-Carded.-8" Minimum tank diameter.-150+ Watts per square inch. Specifications: -1500W Voltage: 120.-2000W Voltage: 240. Dimensions: -Dimensions: 14.5"H x 3.63"W x 1.75" D...