Enter FORWARD5 at Checkout for 5% OFF & Free Shipping in Australia

{"id":5512492023963,"title":"Aqua Pro 69719 4.5\" Long Lead Free Magnesium Anode Rod with 1\/2\" Male Pipe Thread","handle":"aqua-pro-69719-4-5-long-lead-free-magnesium-anode-rod-with-1-2-male-pipe-thread","description":"\u003ch3\u003eAqua Pro 69719 4.5\" Long Lead Free Magnesium Anode Rod with 1\/2\" Male Pipe Thread\u003c\/h3\u003e\n\u003cp id=\"b\"\u003eWater Heater Anode Rod; For Atwood Water Heaters; 4-1\/2 Inch Length;\nMagnesium; With 1\/2 Inch Male Pipe Thread Drain Plug; Without Retail\nPackaging; Lead Free\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003eFor Atwood water heaters\u003c\/li\u003e\n \u003cli\u003eLead free\u003c\/li\u003e\n \u003cli\u003e4.5 inches long\u003c\/li\u003e\n \u003cli\u003e1\/2 inch male pipe thread\u003c\/li\u003e\n \u003cli\u003eBulk\u003c\/li\u003e\n \u003c\/ul\u003e\n\n\n\n\n","published_at":"2020-08-19T00:51:25+10:00","created_at":"2020-08-19T00:51:25+10:00","vendor":"Aquapro","type":"Water Heaters","tags":[],"price":13800,"price_min":13800,"price_max":13800,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":35561931374747,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"B0085IJSLQ","requires_shipping":true,"taxable":true,"featured_image":null,"available":true,"name":"Aqua Pro 69719 4.5\" Long Lead Free Magnesium Anode Rod with 1\/2\" Male Pipe Thread","public_title":null,"options":["Default Title"],"price":13800,"weight":91,"compare_at_price":null,"inventory_management":null,"barcode":"088805697199","requires_selling_plan":false,"selling_plan_allocations":[]}],"images":["\/\/leoforward.com\/cdn\/shop\/products\/B0085IJSLQ.jpg?v=1651051724"],"featured_image":"\/\/leoforward.com\/cdn\/shop\/products\/B0085IJSLQ.jpg?v=1651051724","options":["Title"],"media":[{"alt":" [AUSTRALIA] - Aqua Pro 69719 4.5\" Long Lead Free Magnesium Anode Rod with 1\/2\" Male Pipe Thread","id":29644166168813,"position":1,"preview_image":{"aspect_ratio":3.85,"height":665,"width":2560,"src":"\/\/leoforward.com\/cdn\/shop\/products\/B0085IJSLQ.jpg?v=1651051724"},"aspect_ratio":3.85,"height":665,"media_type":"image","src":"\/\/leoforward.com\/cdn\/shop\/products\/B0085IJSLQ.jpg?v=1651051724","width":2560}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"\u003ch3\u003eAqua Pro 69719 4.5\" Long Lead Free Magnesium Anode Rod with 1\/2\" Male Pipe Thread\u003c\/h3\u003e\n\u003cp id=\"b\"\u003eWater Heater Anode Rod; For Atwood Water Heaters; 4-1\/2 Inch Length;\nMagnesium; With 1\/2 Inch Male Pipe Thread Drain Plug; Without Retail\nPackaging; Lead Free\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003eFor Atwood water heaters\u003c\/li\u003e\n \u003cli\u003eLead free\u003c\/li\u003e\n \u003cli\u003e4.5 inches long\u003c\/li\u003e\n \u003cli\u003e1\/2 inch male pipe thread\u003c\/li\u003e\n \u003cli\u003eBulk\u003c\/li\u003e\n \u003c\/ul\u003e\n\n\n\n\n"}

Aqua Pro 69719 4.5" Long Lead Free Magnesium Anode Rod with 1/2" Male Pipe Thread

In Stock. Leaves warehouse within 2 - 3 business days

$138.00 AUD
Maximum quantity available reached.
Free Shipping Australia Wide
100% Safe & Secure Checkout
100 Days Return Policy *
1 Year Warranty *

Aqua Pro 69719 4.5" Long Lead Free Magnesium Anode Rod with 1/2" Male Pipe Thread

Water Heater Anode Rod; For Atwood Water Heaters; 4-1/2 Inch Length; Magnesium; With 1/2 Inch Male Pipe Thread Drain Plug; Without Retail Packaging; Lead Free

Product Features

  • For Atwood water heaters
  • Lead free
  • 4.5 inches long
  • 1/2 inch male pipe thread
  • Bulk

Related Products